Gas Compressor icon

Gas Compressor

3.5.0 for Android
3.5 | 5,000+ Lượt cài đặt

At Work Rio Solutions Ltda

Mô tả của Gas Compressor

Compressor has a brand new interface with unique features such as station design and customized units.
New in this version: Equation Of States and Gas Composition.
Compressor is a versatile and practical application that helps engineers and technicians to calculate gas compressor requirements such as actual flow, head and power and produce output reports to be sent to (i) other professionals to exchange opinions on how understand and solve operational problems or to (ii) manufacturers to speed up the process of technical discussions along the buying process of a compressor. Compressor is also a helping tool to engineering and technical students to familiarizing with gas compression process.

Tính năng Mới Gas Compressor 3.5.0

New Equations Of State!
- Peng-Robinson
- Soave Redlich-Kwong
- BWRS

Thông tin bổ sung

  • Danh mục:
    Doanh nghiệp
  • Phiên bản mới nhất:
    3.5.0
  • Đã cập nhật:
    2020-10-07
  • Kích thước:
    3.9MB
  • Yêu cầu:
    Android 4.1 or later
  • Nhà phát triển:
    At Work Rio Solutions Ltda
  • ID:
    com.atworkrio.compressor