Waveform Generator Demo icon

Waveform Generator Demo

1.5 for Android
3.9 | 50,000+ Installs

Trono

Description of Waveform Generator Demo

Waveform Generator Demo is a DEMO version of a complete waveform generator that fits inside your pocket! Use it to test your measurement equipment, apply signals as input to your electronic circuits. It doesn't end with electronic applications though. Use it to map the resonance pattern of a room, to calibrate a microphone setup or just to annoy your friends!
The pro version features all important functions of a real waveform generator. The Lite version is here for you to see if you like our user interface and on the fly generation features. If you like what you see, consider buying the pro version. Now the lite versions frequency limit for sine waves has been removed!
Features:
-Friendly user interface: Similar to well-known professional hardware waveform generators.
-On the fly generation: No need to pause and restart the signal in order for changes to take effect!
-Sine, Square, Triangle and Saw waves
-Frequency Range: 1 Hz - 22050* Hz
-Amplitude control
-Preview waveform
-Save/Load waveform to/from internal memory, one slot (infinite slots in Pro)
-Request your own feature
-App2SD Support
Pro Features:
-Random Noise: White (Gaussian), Pink, Brown
-AM (DSB and DSB-SC) / FM with Modulation Freqency and Level control
-Sine Sweep with Repeat and Ping-Pong selection
-Infinite Save/Load slots
*Quality of high frequency waveforms might vary across devices.
Keywords: waveform, function, signal, tone, audio, generator, Trono Tech
DISCLAIMER:
This app is provided by Trono Tech and while we endeavor to keep the app up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the app or the information, products, services, or related graphics contained in the app for any purpose. Any reliance you place on such information is therefore strictly at your own risk. In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from the use of this app.

What's New with Waveform Generator Demo 1.5

V 1.5:
-Android 4.0 Bug Fixes!
-Save/Load screen larger on Android 4.0
-Decent theme with action bar for Androdi 4.0

Information

  • Category:
    others
  • Latest Version:
    1.5
  • Updated:
    2013-06-15
  • File size:
    193.6KB
  • Requirements:
    Android 4.0 or later
  • Developer:
    Trono
  • ID:
    com.tronotech.waveformgeneratorlite
  • Available on: