Universal Remote For All GTPL TV icon

Universal Remote For All GTPL TV

1.0 for Android
3.0 | 5,000+ Installs

VK Andro Hub

Description of Universal Remote For All GTPL TV

For Smart TVs / Devices, the only setting required is to connect your phone as well as your Smart TV / Device to the same Wifi network.
For IR TVs, your phone must have a built-in Infrared (IR) feature for the app to work as a remote control. The IR feature is required to send signals from your phone to the TV set just like a normal TV remote.
Now you can Cast media files stored on your mobile phone to your Smart TV screen.
*Easy To Use*
# Remote automatically sets up all the devices in your Wi-Fi network which can be controlled through IR.
# Else, you can set up remotes for your TV and cable / satellite box and use your phone to control your TV and DTH / cable box.
-- Features --
- Plug and Play Install
- All Functionalities in GTPL Remote is available in this GTPL TV Remote
- WiFi Functionality is available for Android Smart TV Casting
- Any Last Used Sony Remote is easily reached via Saved Option
-Easy to configure.
-Supports multiple configures devices and can be found in "Saved Devices"
- Vibration ON/OFF Options are available in Drawer Menu
--Disclaimer--
GTPL remote app supported Wifi connections.To use this app, you must connect your android device to the same network as your TV.
- It is IR based remote controller, you should have a built-in IR transmitter or external infrared to control the TV.
- This is not official remote control of GTPL Company. We have just collected the codes for the convenience of use This app allows you to control your GTPL TV device from your smartphone.

Information

  • Category:
    Tools
  • Latest Version:
    1.0
  • Updated:
    2021-04-29
  • File size:
    8.3MB
  • Requirements:
    Android 4.1 or later
  • Developer:
    VK Andro Hub
  • ID:
    com.Universal.GTPLtv.forallremote.control_forallgtplremote.alldevices
  • Available on: