Chemistry Formulas icon

Chemistry Formulas

2.0.1 for Android
3.7 | 5,000+ Installs

Edu Technologies

Description of Chemistry Formulas

Chemistry Formulas
The app lists all the important Chemistry formulas. Its very useful for student to save valuable time.
This App contains following formulas :
Ideal Gas Law
Boyle's Law
Charles Law
Gay-Lussac's Law
Combined Gas Law
Crude Protein Estimation
Crude Fibre Estimation
Molar Mass of Gas
Dilution of Solutions
Estimation of Calcium by Titration
Sand Silica Estimation
Chloride as SodiumChloride Titration
Equivalent Weight of Acid
Neutralization Reaction
Unknown Metal Weight
Oxidizing and Reducing Agents
Henderson Hasselbalch Equation
Soluble Protein Estimation
Hydrogen Ion Concentration
Enthalphy
Ether Extract Percentage
Fatty Acid
Equivalent Mass of Acid
Double Decomposition
Equivalent Oxygen Weight
Molarity
Dalton's Law
Avogadro's Number
Radioactive Decay
Arrhenius Equation
Atoms to Moles
Atomic Mass
Molar Heat (or Enthalpy) of Vaporization
Vapour Density of Gas
Molecular Mass using GMV Law
Mass Percent Chemical without Given Masses
Mass Percent Chemicals with Masses
Chemical Bond Polarity
Dilution Factor
Density of Liquid
Ionic Strength
Saponification value
Buffer capacity
Acid Rain Formula
Absolute Error Formula
Mean Absolute Error
This is an app designed for Students for quick access to Chemistry Formulas. Chemistry formulas can be memorize. So here is a simple way to refer to them and sharpen your Chemistry skills.

Information

  • Category:
    Education
  • Latest Version:
    2.0.1
  • Updated:
    2019-01-10
  • File size:
    2.3MB
  • Requirements:
    Android 4.1 or later
  • Developer:
    Edu Technologies
  • ID:
    com.edutechnologies.tee