ikon Stickman Bike Wheelie

Stickman Bike Wheelie

1.0 for Android
3.4 | 10,000+ Instal

Valcom IT Services

Penjabaran dari 9apps StickmanBike

Welcome to the official store for application World. 20,000+ users downloaded Stickman Bike Wheelie latest version on 9Apps for free every week! The app is superior that can be used with any of the mobile type. This hot app was released on 2019-10-15. Download in official websites like 9apps and you'll never miss it!
Welcome to the Stickman wheelie nation ! can you perform wheelie for 10 seconds ?.
Finding the right balance for doing a wheelie for a long distance is the challenge
Perform the greatest wheelies on bikes with a single tap! Have fun
Game Features:
- lot of bikes with different stickman characters to unlock
- Endless gameplay
- Simple tap control
Selamat datang di negara penjual stickman! dapatkah kamu melakukan wheelie selama 10 detik?
 Menemukan keseimbangan yang tepat untuk melakukan wheelie untuk jarak jauh adalah tantangannya
Lakukan wheelies terhebat di sepeda hanya dengan satu ketukan! Selamat bersenang-senang
Fitur Game:
- Banyak sepeda dengan karakter stickman yang berbeda untuk dibuka
- Gameplay tak berujung
- Kontrol keran sederhana

Memperbarui StickmanBike 1.0

Stickman Bike Wheelie

Informasi

  • Kategori:
    Olahraga
  • Versi Terbaru:
    1.0
  • Perbarui:
    2019-10-01
  • Ukuran File:
    28.5MB
  • Persyaratan:
    Android 4.1 or later
  • Diupdate:
    Valcom IT Services
  • ID:
    com.valcomit.stickmanbikewheelie
  • Available on: