Following is the introduction of a wonderful App. 30,000+ users downloaded Drift For Speed latest version on 9Apps for free every week! You get various free apps from the store. This hot app was released on 2019-07-27. Here are some guides of this app:
is a racing casual game. This game is about using several racing cars to drift and avoid obstacles. With simply operate, varied racing tracks and supports online multiplayers mode, this game will become you best choice, and realize your racer’s dream.
1. 100% restore the most realistic racing experience.
2. With more than 100 levels to challenge.
3. Challenge other racers in online mode, to be the best racers in the world!.
adalah game kasual balap. Game ini adalah tentang menggunakan beberapa mobil balap untuk melayang dan menghindari rintangan. Dengan hanya mengoperasikan, trek balap yang bervariasi dan mendukung mode multiplayer online, game ini akan menjadi pilihan terbaik Anda, dan mewujudkan impian pembalap Anda.
1. 100% mengembalikan pengalaman balap paling realistis.
2. Dengan lebih dari 100 level untuk ditantang.
3. Tantang pembalap lain dalam mode online, untuk menjadi pembalap terbaik di dunia !.
This is a new game,hope you like it.