Gate Rush Ball आइकन

Gate Rush Ball

1.2 for Android
3.0 | 10,000+ इंस्‍टॉल की संख्या

Moni Puzzle Studio

का वर्णन Gate Rusher Ball

There's no denying the fact that 30,000+ users downloaded Gate Rusher Ball latest version on 9Apps for free every week! The app has made a strong effect. This hot app was released on 2019-06-20. You can enjoy the most completed function of this app.
Gate Rush Ball combines music game,very easy to play.
Gate Rush Ball creates an amazing space to experience one of the most addicting games and music games with the amazing speed while rolling ball.
Think fast and touch to change lanes to reach incredible speeds! with one touch on the screen the game is easy to control. Do not miss the doors. Show your skills. Pass all levels Either precise.
Features:
* Gate Rush Ball only one finger tap.
* Unique rush ball and Rich visual effects.
* Diffrent Level and Diifrent Ball Effects.
* Get gems and unlock new balls.
Download now and experience Gate Rush Ball !
गेट रश बॉल संगीत खेल को जोड़ती है Ball खेलने के लिए बहुत आसान है।
गेट रश बॉल गेंद को रोल करते समय आश्चर्यजनक गति के साथ सबसे अधिक खेलों और संगीत खेलों में से एक का अनुभव करने के लिए एक अद्भुत स्थान बनाता है।
अविश्वसनीय गति तक पहुंचने के लिए लेन बदलने के लिए तेजी से सोचें और स्पर्श करें! स्क्रीन पर एक स्पर्श के साथ खेल को नियंत्रित करना आसान है। दरवाजे याद नहीं। अपना कौशल दिखाओ। सभी स्तरों को पास करें।
विशेषताएं:
* गेट रश बॉल केवल एक उंगली टैप।
* अद्वितीय भीड़ गेंद और रिच दृश्य प्रभाव।
* डिफेंट लेवल और डायफेंट बॉल इफेक्ट।
* रत्न प्राप्त करें और नई गेंदों को अनलॉक करें।
अब डाउनलोड करें और गेट रश बॉल का अनुभव करें!

अद्यतन Gate Rusher Ball 1.2

++ Fix Bug

जानकारी

  • श्रेणी:
    आर्केड गेम
  • नवीनतम संस्करण:
    1.2
  • आधुनिक बनायें:
    2019-06-20
  • फाइल का आकार:
    23.9MB
  • जरूरतें:
    Android 4.1 या बाद में
  • अपडेट करने की तारीख:
    Moni Puzzle Studio
  • ID:
    com.moni.puzzle.gaterushball