Headhunter Zombies icon

Headhunter Zombies

1.0 for Android
3.0 | 5,000+ Installs

Ldy Ayuni

Description of Headhunter Zombies

It is time to rise from the depths of hell blowing the heads of your enemies. When you are near the zombies you tap the screen to use your weapon and kill them. Plenty of speed and action so you can not stop playing.
You can use katanas, sticks and baseball bats to leave no head in place. But beware, if you collide with one of them you will be eaten without remedy.
Collect all the gems on your way to score points and compete with the best in the ranking. Tami can score points by destroying pumpkins or destroying your enemies.
Play incredible increasingly difficult. Hell, swamp, cemetery ... all are a battlefield. Ride through them at high speed with your snowboard.
The flames will give you extra speed to reach your goal as soon as possible.
Interrogations will give new missions. If you manage to complete the encomendad mission, you unlock achievements. There are a lot of different achievements more difficult it is.
Avoid volcanoes, tombs, trees and other obstacles if you do not want to end deborado.
Please, rate our game, and let us know your suggestions and requests writting reviews.
Visit us on Facebook:
https://www.facebook.com/melocotonwarsgames?fref=ts
This is a war against very angry monsters. We wish you have a scary Halloween.

Information

  • Category:
    Action
  • Latest Version:
    1.0
  • Updated:
    2016-02-29
  • File size:
    31.1MB
  • Requirements:
    Android 2.3 or later
  • Developer:
    Ldy Ayuni
  • ID:
    com.melocotonwars.headhunterzombies