Animal Bubble Shooter icon

Animal Bubble Shooter

1.0.2 for Android
3.0 | 10,000+ Installs

Diệp van Tiến

Description of Animal Bubble Shooter

Fun and addictive bubble shoot game!
Another classic bubble match-three game come to Google Play.
Clear all the bubbles on the screen to level up,and try to get 3 stars on each level.
How to play:
1.Tap where you want the bubble.
2.To group 3 or more bubbles to make them burst.
Tips: Breaking the bubbles continuously can get points as bonus.
Features:
- Puzzle Mode,use the limited bubbles to clear all the bubbles on the screen.
- Arcade Mode,clear all the descending bubbles.
- Having 300 different and challenging levels.
- Having sky castle,starry night, and other beautiful scenes.

Information

  • Category:
    Casual
  • Latest Version:
    1.0.2
  • Updated:
    2015-11-30
  • File size:
    24.2MB
  • Requirements:
    Android 2.3 or later
  • Developer:
    Diệp van Tiến
  • ID:
    com.gamegranth.AnimalBubbleShooter