Gate Rush Ball icon

Gate Rush Ball

1.2 for Android
3.0 | 10,000+ การติดตั้ง

Moni Puzzle Studio

คำอธิบายของ Gate Rusher Ball

This article is about hot apps for android. 20,000+ users downloaded Gate Rusher Ball latest version on 9Apps for free every week! You will feel better when you start playing This hot app was released on 2019-06-20. I believe that if you are an android apps lover, you would not miss it.
Gate Rush Ball combines music game,very easy to play.
Gate Rush Ball creates an amazing space to experience one of the most addicting games and music games with the amazing speed while rolling ball.
Think fast and touch to change lanes to reach incredible speeds! with one touch on the screen the game is easy to control. Do not miss the doors. Show your skills. Pass all levels Either precise.
Features:
* Gate Rush Ball only one finger tap.
* Unique rush ball and Rich visual effects.
* Diffrent Level and Diifrent Ball Effects.
* Get gems and unlock new balls.
Download now and experience Gate Rush Ball !

มีอะไรใหม่ Gate Rusher Ball 1.2

++ Fix Bug

ข้อมูล

  • ประเภท:
    อาร์เคด
  • เวอร์ชันปัจจุบัน:
    1.2
  • อัปเดตเมื่อ:
    2019-06-20
  • ขนาด:
    23.9MB
  • เวอร์ชัน Android ที่กำหนด:
    Android 4.1 or later
  • นักพัฒนาซอฟต์แวร์:
    Moni Puzzle Studio
  • ID:
    com.moni.puzzle.gaterushball