Squid Game challenge icon

Squid Game challenge

1.0 for Android
3.0 | 5,000+ Pemasangan

Whitepaper

⚠️ You need 9Apps App to install .XAPK File. How to install XAPK?

Penerangan tentang Squid Game challenge

The Squid Survival Shooting Games
Squid Games Survival Shooting Games feature Games such as Red Light, Green Light.
Life is more fun with the Squid Games!
Be sure not to miss the final squid games survival game, which is a real roller-coaster.
Squid Game challenge for Android. Play Round Four mini games for win.
In this Squid Game - New Survival Challenge a man with a gun will appear throughout the squid survival game at any time to kill you in this stickman ragdoll game.
You will act as a player and join this crazy squide game.
The only way to get out of this hell is to win the squid survival games.
-Stop at the red light
- Red Light, Green Light
-Number of mission and/or levels in the game
-Continue when the green light is on
-Music tracks and quality
-Fast Runner doll is watching👀
-The Squid Game
-Knock down your competitors!
-Glass Stepping Stones
-Win💰46.5 billion, win or DIE🙅‍♀️
Disclaimer:
Meta Data is the copyright of their respective owners. This application is an unofficial fan-based application not real squid game series relate.
No copyright infringement is intended, and any request to remove one of the images/logos/names ( metadata ) will be honored.

Maklumat

  • Kategori:
    Kasual
  • Versi Semasa:
    1.0
  • Dikemas kini:
    2022-02-17
  • Saiz:
    29.6MB
  • Memerlukan Android:
    Android 4.4 or later
  • Pembangun:
    Whitepaper
  • ID:
    com.squidgame.challenge.survival