Race aventure cars icon

Race aventure cars

1.1 for Android
3.0 | 10,000+ Pemasangan

Win Naing Chay

Penerangan tentang Race aventure cars

Are you ready to test your track Cars in this edition of Race aventure cars skills game.
Race aventure cars Skills is the world's #1 side-scrolling racs racing game available on Android. The unparalleled physics engine gives you a level of control that you won’t believe what you’re playing in the palm of your hand! Race cars , ex Motorcycle Taxis Cars Speed racing moto car
Launch off an enormous jump, land on your rear wheel and crash your way through a variety of well designed levels. Your reflexes will mean the difference between surviving or crashing in spectacular fashion.
Game Features:
- Includes 30 amazing well designed tracks and more free tracks coming soon
- Realistic bike physics and working bike shocks
- Agile and fast reacting bike using accelerometer
- Crazy addictive game-play with ultra smooth tilt controls
- Eye popping high definition graphics
can drives the vespa by sensor or by touch
How to Play:
- Touch left side to accelerate and touch right side to brake
Classic Vespa !!!

Maklumat

  • Kategori:
    Cabaran
  • Versi Semasa:
    1.1
  • Dikemas kini:
    2015-09-30
  • Saiz:
    9.3MB
  • Memerlukan Android:
    Android 2.3.3 or later
  • Pembangun:
    Win Naing Chay
  • ID:
    com.Race.Cars