* Have a dream of best driver
* Drive fast on a winding road
* A simple interface with the tilt sensor
* break a world record
You must drive your car on the road to the destination
You can have a world record
If your car stray out of its road you get a warning and if you have three warnings you will get a fail
in a pass, You get the additional time in the number of warning
You can change the stop point of tilt sensor
Your car can speed up with a booster
(v1.2)
[1]A network bug is corrected
[2]A link bug is corrected in some phone